Construction Scheduler
Posted:
Monday, 15 April 2024
Valid Thru:
Wednesday, 15 May 2024
Index Requested on:
04/15/2024 19:31:24
Indexed on:
04/15/2024 19:31:24
Location:
Norfolk, VA, 23501, US
Industry:
Advertising and Public Relations
Occupational Category:
13-0000.00 - Business and Financial Operations
Type of Employment: FULL_TIME
Bristol Industries LLC is hiring!
Description:
Bristol Infrastructure Design Services LLC, is hiring a Construction Scheduler to provide professional support services to the Department of Navy in Norfolk, VA.
Major Responsibilities
• Provides assistance and technical guidance to engineers/architects exercising construction oversight and design management of Capital Improvements projects.
• Routinely communicate and coordinate with other technical and non-- technical NAVFAC personnel within the Facilities Engineering Command .
• Reviewing the scope of individual projects and proposing reasonable construction durations.
• Review of Baseline Schedules and monthly contractor updates to determine the validity and conformance to contract requirements.
• Assist in the validation of impacts to the approved construction schedule.
• Provide analysis on how the contractor can recover, if at all, from current delays to meet the contract completion date.
• Develop, maintain, and provide scheduling training to each field office and respective personnel covering the basic understanding of network analysis schedules,
critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, guide specifications requirements, and software usage.
• Provide guidance and training to Design staff in the proper editing and use of the scheduling guide specification for incorporation into contract documents
Minimum Education/Experience
Engineering Degree, Associates Degree in Construction Management, Construction Technology or Building Construction and a minimum of 5 years of Construction Scheduling experience OR a High School Diploma and 10 years of Construction Scheduling experience.
Required Knowledge or Skills
• A minimum of 7 years of construction scheduling experience utilizing Primavera P6 or its earlier versions.
• Experience in preparing or analyzing Time-Impact-Analysis as it relates to time extension requests or claims.
• Ability to evaluate baseline schedules and monthly updates.
• Ability to manage multiple priorities and, when requested, independently develop and provide technical recommendations/ solutions regarding scheduling issues and time impacts on complex problems encountered during the administration of the construction contracts.
Preferred Knowledge or Skills
• Registration as a Planning and Scheduling Professional (PSP) is desirable.
Physical Demands
• Light physical workload.
• Required to have close visual acuity to perform activities such as viewing a computer terminal and extensive reading.
• Specific physical requirements include, but are not limited to, climbing, balancing, stooping, kneeling, reaching, walking, lifting, grasping, talking, hearing, and performing repetitive motions.
• The worker is subject to both inside and outside environmental conditions.
Benefits
Excellent salary and benefits package to include: paid time off, paid holidays, comprehensive health insurance plan including medical, dental, vision, life insurance, long-term disability insurance; 401(k) plan with employer match.
Responsibilities:
Please review the job description.
Educational requirements:
Desired Skills:
Please see the job description for required or recommended skills.
Benefits:
Please see the job description for benefits.
Apply Now