MEP Commissioning Engineer - Data Center Construction
Sundt Construction, Inc.
Location: Lockhart, TX 78644, US
Employment Type: FULL_TIME
Industry: Advertising and Public Relations
Occupational Category: 13-0000.00 – Business and Financial Operations
Posted: Saturday, 29 August 2026
Valid Through: Monday, 28 September 2026
Job Description
Sundt Construction, Inc. is hiring a MEP Commissioning Engineer - Data Center Construction in Lockhart, TX. This is a full-time position.
JOB DESCRIPTION
Job Summary
Directs and coordinates program activities designed to provide subcontractors, management, and customers with setup and commissioning knowledge to ensure effective and economical engineering support. Analyzes contractual commitments, customer specifications, design changes, and other data to plan and develop commissioning & start-up program activities from conceptual stage through life-cycle of product. Develops and implements program activities, coordinates efforts of subcontractors, production departments, and field service personnel, and resolves problems in area of logistics to ensure meeting of contractual commitments. Compiles data on standardization and interchangeability of parts to expedite commissioning & start-up activities. Determines logistic support sequences and time phasing, problems arising from location of operational area, and other factors.
Key Responsibilities
1. Capable of resolving escalated issues arising from operations and requiring coordination with other departments. 2. Conduct commissioning coordination meetings as needed with the owner, project management, contractor, and other commissioning team members as defined in the commissioning plan. 3. Ensures all construction engineering projects, initiatives, and processes are in conformance with organization's established policies and objectives. 4. Experience with commissioning & start-up engineering as well as related systems. 5. Find ways to reduce operating and maintenance costs, improve the comfort of a building's occupants and extend the life of the equipment. 6. Improve, refine, and augment Sundt's commissioning procedures and documentation to enhance the commissioning team processes. 7. Manage project specific pre-start, start-up, and test-adjust-balance, and commissioning fieldwork. 8. Monitor the latest industry trends and share knowledge with commissioning team members. 9. Provides input to strategic decisions that affect commissioning and start-up engineering support. 10. Verify the operation of the systems in the commissioning scope, including establishing acceptance criteria, obtaining completed reports from the installing vendor, and direct performing testing and verification.
Minimum Job Requirements
1. BA/BS Engineering degree or equivalent work experience required. 2. FE designation through the NCEES or PE license preferred. 3. Must have demonstrated proficiency for all the responsibilities of a Commissioning Engineer; 5 years of experience in the commissioning field including performance contracting requirements preferred. 4. Proficiency in SCA, PECI and/or ASHRAE commissioning procedures preferred. 5. Proficient use of all Microsoft Office Suite programs.
Note: Job Description is subject to change at any time and may include other duties as assigned.
Physical Requirements 1. May stoop, kneel, or bend, on an occasional basis 2. Must be able to comply with all safety standards and procedures 3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 4. Will interact with people and technology frequently during a shift/work day 5. Will lift, push or pull objects up to 501bs on an occasional basis. 6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day. 7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
Safety Level
Safety-Sensitive
Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
Job Summary
Directs and coordinates program activities designed to provide subcontractors, management, and customers with setup and commissioning knowledge to ensure effective and economical engineering support. Analyzes contractual commitments, customer specifications, design changes, and other data to plan and develop commissioning & start-up program activities from conceptual stage through life-cycle of product. Develops and implements program activities, coordinates efforts of subcontractors, production departments, and field service personnel, and resolves problems in area of logistics to ensure meeting of contractual commitments. Compiles data on standardization and interchangeability of parts to expedite commissioning & start-up activities. Determines logistic support sequences and time phasing, problems arising from location of operational area, and other factors.
Key Responsibilities
1. Capable of resolving escalated issues arising from operations and requiring coordination with other departments. 2. Conduct commissioning coordination meetings as needed with the owner, project management, contractor, and other commissioning team members as defined in the commissioning plan. 3. Ensures all construction engineering projects, initiatives, and processes are in conformance with organization's established policies and objectives. 4. Experience with commissioning & start-up engineering as well as related systems. 5. Find ways to reduce operating and maintenance costs, improve the comfort of a building's occupants and extend the life of the equipment. 6. Improve, refine, and augment Sundt's commissioning procedures and documentation to enhance the commissioning team processes. 7. Manage project specific pre-start, start-up, and test-adjust-balance, and commissioning fieldwork. 8. Monitor the latest industry trends and share knowledge with commissioning team members. 9. Provides input to strategic decisions that affect commissioning and start-up engineering support. 10. Verify the operation of the systems in the commissioning scope, including establishing acceptance criteria, obtaining completed reports from the installing vendor, and direct performing testing and verification.
Minimum Job Requirements
1. BA/BS Engineering degree or equivalent work experience required. 2. FE designation through the NCEES or PE license preferred. 3. Must have demonstrated proficiency for all the responsibilities of a Commissioning Engineer; 5 years of experience in the commissioning field including performance contracting requirements preferred. 4. Proficiency in SCA, PECI and/or ASHRAE commissioning procedures preferred. 5. Proficient use of all Microsoft Office Suite programs.
Note: Job Description is subject to change at any time and may include other duties as assigned.
Physical Requirements 1. May stoop, kneel, or bend, on an occasional basis 2. Must be able to comply with all safety standards and procedures 3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 4. Will interact with people and technology frequently during a shift/work day 5. Will lift, push or pull objects up to 501bs on an occasional basis. 6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day. 7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
Safety Level
Safety-Sensitive
Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
Education Requirements
high school
Skills
Please see the job description for required or recommended skills.
Benefits
Please see the job description for benefits.
Index requested: 08/29/2026 07:00:20 • Indexed: 08/29/2026 07:00:20