Doc Control Specialist - Data Center Construction
Sundt Construction, Inc.
Location: Lockhart, TX 78644, US
Employment Type: FULL_TIME
Industry: Advertising and Public Relations
Occupational Category: 13-0000.00 – Business and Financial Operations
Posted: Monday, 05 October 2026
Valid Through: Wednesday, 04 November 2026
Job Description
Sundt Construction, Inc. is hiring a Doc Control Specialist - Data Center Construction in Lockhart, TX. This is a full-time position.
JOB DESCRIPTION
Job Summary
Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site. This work will be performed under general supervision.
Key Responsibilities
1. Assists with the document preparation for scanning (i.e., removes all staples, paper clips).
2. Handles document retrieval requests, and assists in document reproduction .
3. Maintains the master project/drawing / specification files as the repository of design /construction documents.
4. Maintains transmittal logs and records and ensures compliance.
5. Organize, prepare and box in-active records for archives, storage, retention and/or destruction.
6. Responsible for maintenance of the project electronic and physical library records.
7. Serves as main contact for file maintenance, quality control and retrieval of physical files within the central library.
8. Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.
Minimum Job Requirements
1. 3-5 years of previous support experience required. Experience with Contract Manager or other contract management tool is preferred.
2. Familiarization with Prolog, ERP systems and other related project management software preferred.
3. Must be detailed oriented, have excellent organizational skills and have the ability to multi-task.
4. Proficiency with Microsoft Office Package; strong understanding of Word, Excel, and Outlook.
5. Requires a high school diploma, Associate's Degree preferred (or equivalent working knowledge/experience).
6. Strong interpersonal and communication skills, both written and verbal, and a professional demeanor are required.
Note: Job Description is subject to change at any time and may include other duties as assigned.
Physical Requirements
1. May stoop, kneel, or bend, on an occasional basis
2. Must be able to comply with all safety standards and procedures
3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4. Will interact with people and technology frequently during a shift/work day
5. Will lift, push or pull objects pounds on an occasional basis
6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
Safety Level
Safety-Sensitive
Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
#LI-HW1
Job Summary
Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site. This work will be performed under general supervision.
Key Responsibilities
1. Assists with the document preparation for scanning (i.e., removes all staples, paper clips).
2. Handles document retrieval requests, and assists in document reproduction .
3. Maintains the master project/drawing / specification files as the repository of design /construction documents.
4. Maintains transmittal logs and records and ensures compliance.
5. Organize, prepare and box in-active records for archives, storage, retention and/or destruction.
6. Responsible for maintenance of the project electronic and physical library records.
7. Serves as main contact for file maintenance, quality control and retrieval of physical files within the central library.
8. Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.
Minimum Job Requirements
1. 3-5 years of previous support experience required. Experience with Contract Manager or other contract management tool is preferred.
2. Familiarization with Prolog, ERP systems and other related project management software preferred.
3. Must be detailed oriented, have excellent organizational skills and have the ability to multi-task.
4. Proficiency with Microsoft Office Package; strong understanding of Word, Excel, and Outlook.
5. Requires a high school diploma, Associate's Degree preferred (or equivalent working knowledge/experience).
6. Strong interpersonal and communication skills, both written and verbal, and a professional demeanor are required.
Note: Job Description is subject to change at any time and may include other duties as assigned.
Physical Requirements
1. May stoop, kneel, or bend, on an occasional basis
2. Must be able to comply with all safety standards and procedures
3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4. Will interact with people and technology frequently during a shift/work day
5. Will lift, push or pull objects pounds on an occasional basis
6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
Safety Level
Safety-Sensitive
Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
#LI-HW1
Education Requirements
high school
Skills
Please see the job description for required or recommended skills.
Benefits
Please see the job description for benefits.
Index requested: 10/05/2026 03:22:52 • Indexed: 10/05/2026 03:22:52